Supply, construction and operations under one contract.

Everything a first utility-scale project needs to reach commercial operation — and everything required to keep it producing afterwards.

What we deliver

Two capabilities, one accountable contract.

All services
01Panels, modules and cables

Large-scale supply

Tier-1 modules, DC harnesses and medium-voltage cable delivered to site on a staged schedule — with a bankable bill of materials and full traceability from factory to foundation.

  • Tier-1 modules & bifacial supply
  • DC and MV cable assemblies
  • Warehouse staging & just-in-time delivery
02Build, commission, operate

Installation & maintenance

Self-perform construction, commissioning and long-term operations for the solar grid — one accountable partner from the first pile to the last performance report.

  • Civil, racking & electrical construction
  • Interconnection & commissioning
  • Monitoring, cleaning & scheduled O&M

Supply matrix

Hardware that clears diligence.

Four packages, one bill of materials. Select a category to review the specification we quote against.

Lead times from US warehousing · 4–6 weeks

Tier-1 monocrystalline bifacial modules, supplied in full container quantities with flash-test data and serial-level traceability. Domestic-content documentation is prepared for every shipment.

Power class
550 – 620 W
Efficiency
up to 23.2%
Performance warranty
30 years
Certification
UL 61701 / IEC 61215

Installation & maintenance

Crews that build the array and then stay on it.

Self-perform construction means the people who commission the plant are the people who keep it performing. No handover gap, no third-party finger-pointing.

  • Pile driving, racking and module installation
  • DC collection, MV cable and substation works
  • Interconnection testing and commissioning
  • Preventive maintenance, cleaning and inspection
  • Inverter and tracker servicing
  • Annual performance reporting against the model

Availability target

98.5% contractual

Crew coverage

Regional hubs, 3 markets

Delivery model

Four phases from study to steady output.

Each phase closes with a document you can hand to a board, a lender or an insurer — not a verbal update.

  1. 01

    Feasibility & interconnection

    We start with the constraint that kills most first projects: interconnection. Load studies, single-line review and a bankable production model come before a single module is ordered.

    Deliverable — Feasibility memo + production model

  2. 02

    Supply & staging

    A frozen bill of materials, locked pricing and staged delivery into a bonded warehouse near your site. You see the same inventory data our field teams see.

    Deliverable — Locked BOM + delivery schedule

  3. 03

    Construction & commissioning

    Self-perform civil, mechanical and electrical crews build to your schedule, with weekly milestone reporting and a commissioning package your lender can accept.

    Deliverable — Commissioning package + as-builts

  4. 04

    Operations & maintenance

    Monitoring, module cleaning, inverter servicing and annual performance reporting against the model we underwrote at feasibility — for the life of the asset.

    Deliverable — Monthly performance reporting

Operations layer

Automated cleaning, continuous monitoring

Response window

4 hours, 24/7

Reporting

Monthly, modelled

Capital gateway

Start with a feasibility study, not a sales call.

Send us your site, target capacity and interconnection status. We return a scoped supply, build and O&M estimate within ten business days.

Initiate feasibility study